PLANNING AND PROCEDURES

Basic HS&E Rules
The HS&E rules, contain in the Company’s Safety Handbook shall be made  available to all employees before they start work. New employees’ HSE Induction, Safety Signs Daily Tool and scheduled (intermittent) safety briefings shall  be used to disseminate information and authenticate the level of HS&E awareness amongst the work force.
The site(s) will use the HSE plan as their basis for  site HSE planning . The accountability of HSE planning is vested on the project Manager. The performance standards established for the project will be cascaded through to the staff.
Targets and objectives

DANELEC LIMITED

Emergency Preparedness
The following are the identified potential emergency Scenarios envisaged during the construction phase of the project:

In the event of an emergency;
All personnel on board would move to the nearest and safest location muster point.
Communication with all designated emergency contact  points and the incident location will be maintained.
Any injured personnel shall be promptly evacuated to the  company’s retained medical clinic.
Awareness amongst site personnel on timely response to emergency alarms will be encouraged.
DANELEC LIMITED
HS&E Equipment and Equipment HS&E Inspection

Below is a list of HS&E equipment to be used in the project identified by the type and capacity. Site supervisor shall inspect and certify this equipment as fit for purpose on receipt from designated vendors.