Hazard Effect Management Process


Project specific Hazard and Effect Management plan (HEMP)

The identification and evaluation of hazard at all stages of contract execution and the development of control measures is part of HSE management system. Identification and evaluation of hazards will be carried out for all DANELEC LIMITED operations.
The purpose of HEMP is to establish a formal system for the performance and documentation of risk assessment of Health safety and Environmental issues on project site.
In line with our guidelines, all project equipment shall be inspected and certified fit for operation by CLIENT prior to mobilization to the site. Site safety officer shall conduct scheduled equipment inspections at the work site.
Project activities shall be covered by detailed work procedure, as developed by the project Engineer and site Engineer.