2008

CROSS RIVERS STATE GOVERNMENT

Rural Electrification at Isiam Etim Government area

2008

CROSS RIVERS STATE GOVERNMENT

Rural Electrification at Bakassi Local Government area(ADDITIONAL)

2008

MARITIME ACADEMY ORON

Supply and Installation of  Equipment for Marine Engineering

2008

CROSS RIVERS STATE GOVERNMENT

Rural Electrification at Bakassi Local Government area

2008 

NAOC

 Refurbishment of  2,5MVA  33/11KV Transforme

2007

NAOC

ESP Rehabilitation  of  Tebidaba Flow Station

2007

NAOC

Electrical Rehabilitation  of  vandalized Obama Flow Station

2007

NIGERIAN BOTTLING COMPANY

EPC 4MVA Substation NBC Factory Benin

2007

NIGERIAN BOTTLING COMPANY

EPC 2,5MVA Substation NBC Factory Owerri

2007

NAOC

Instrumentation Rehabilitation  of  vandalized Tebidaba    Flow           Station

2007

NAOC

Electrical Rehabilitation  of  vandalized Tebidaba Flow Station (Phase 2)

2007

NAOC

Electrical Rehabilitation  of  vandalized Tebidaba Flow Station (phase 1)     

2006

Federal Ministry of Power and Steel

Supply and Installation of all material for the Electrification of Nnelu
Abia State

2005

 Gitto Costruzioni Nigeria Ltd

Supply and Installation of all traffic lights and met bollardswith related power at Uyo metropolis and network roads

2005 

Gitto Costruzioni Nig. Ltd

Supply and Installation of  all Street light and related power for Uyo Abak   Road for Akwa Ibom Government

2005 

Philips Project

Supply and Installation of one substation to the new base in Port Harcourt   33KV 2,5MVA

2005 

NEPA

Supply and Installation of 33KV line Connecting National Grid to Yenagoa

2005 

NIGERIAN AGIP OIL COMPANY

Supply and Installation of 11 KV Cable for the Port Harcourt New  Base main             ring

2004

ABIA STATE

Engineering Procurement and Construction (EPC) of Rehabilitation   Solar Traffic Light in ABA (Involving no. 6 junctions) 

2004

ABIA STATE

Engineering Procurement and Construction (EPC) of Solar Traffic     Light in UMUAHIA (no.  6 junctions) 

2004

BAYELSA STATE GOVERNMENT

Supply, Installation and Training of Laboratory Equipment for Electrical,   Mechanical and Civil Engineering Department, Niger Delta University, Amassoma, Bayelsa State.

2004

NEPTUNE MARITIME TECNIP

EPC of Power Panel for the new base at Rumuolumeni, Port Harcourt

2004

SHELL PETROLEUM DEVELOPMENT COMPANY

EPC Contract for Bille Community Electrification

2004

NIGERIAN AGIP OIL COMPANY

Supply and Installation of one Transformer 33/11KV 2,5MVA NAOC BASE Port Harcourt

2004

NIGERIAN AGIP OIL COMPANY

Supply and Installation of one Transformer 33/11KV 7,5 MVA Ebocha Flow Station

2004

SAIPEM CONTRACTING LTD

Supply and Installation of various LV cables at Samabri Biseni Flow Station

2004

NIGERIAN AGIP OIL COMPANY

Engineering, Procurament and Construction of  ASB and Battery Charger   panels for Samabri Biseni Flow Station 00

2004

NIGERIAN AGIP OIL COMPANY

Refurbishment of the LV panels Control Room TEBIDABA FLOW STATION    Including selectivity study and setting relays Protection

2004

NIGERIAN AGIP OIL COMPANY

Refurbishment of the LV Panel Control Room OBAMA Flow Station, Including selectivity study and Setting Relais Protection

2003

NIGERIAN AGIP OIL COMPANY

Laying and Installation of Cable joints for supply underground cable 33KV from Ninbe/Obama-Tebidaba Flow Stations

2003

NIGERIAN AGIP OIL COMPANY

EPC project for earthing resistor and prot of line 6,000V for  Idu FS

2003

NIGERIAN AGIP OIL COMPANY

EPC PROJECT for SDV drivers 6,000V for Idu flow station

2003

NIGERIAN AGIP OIL COMPANY

Electrical rehabilitation OBAMA Flow station

2003

FEDERAL MINISTRY OF DEFENCE

Barracks rehabilitation at LAGOS

2003

FEDERAL MINISTRY OF POWER AND STEEL

Rural Electrification at Bolo (Rivers State)

2003

FEDERAL MINISTRY OF POWER AND STEEL

Rural Electrification at Ataba (Rivers State)

2003

FEDERAL MINISTRY OF POWER AND STEEL

Supply of no. 50 transformer 33,000/415 500KVA

2003

NAOC

Supply of 3,300m submarine cable with voltage rate of 33,000V

2003

SPDC Port Harcourt

EPC of 11kV substation at the SPDC Port Harcourt residential Area

2003

NAOC

Supply of spare parts ABB-SACE Substation at NAOC Base Port Harcourt

2003

SPDC

EPC Contract for One Substation 1000KW at R.A. Port Harcourt

2003

NAOC

Installation 33KV power station at Clough Creek

2003

RIVERS STATE POWER MINISTRY

Electrification phase 2 and 3 Borokiri (Port Harcourt)

2003

NAOC

Supply of 18,000m submarine cables with voltage rating of 33,000V

2003

NAOC  

EPC NGV CAR FILLING STATION AT OB/OB BASE OBRIKOM (Second Gas Filling Station in Nigeria)   

2003

BONNY ALLIED INDUSTRIES LTD.

EPC for a generator system Comprising of no. 2 Generators Perkins of        1250KVA each with a synchronizing panel and a change over system to     be coupled with the existing power source.

     