YEAR |
CLIENT |
EXECUTED JOB |
2008 |
CROSS RIVERS STATE GOVERNMENT |
Rural Electrification at Isiam Etim Government area |
2008 |
CROSS RIVERS STATE GOVERNMENT |
Rural Electrification at Bakassi Local Government area(ADDITIONAL) |
2008 |
MARITIME ACADEMY ORON |
Supply and Installation of Equipment for Marine Engineering |
2008 |
CROSS RIVERS STATE GOVERNMENT |
Rural Electrification at Bakassi Local Government area |
2008 |
NAOC |
Refurbishment of 2,5MVA 33/11KV Transformer |
2007 |
NAOC |
ESP Rehabilitation of Tebidaba Flow Station |
2007 |
NAOC |
Electrical Rehabilitation of vandalized Obama Flow Station |
2007 |
NIGERIAN BOTTLING COMPANY |
EPC 4MVA Substation NBC Factory Benin |
2007 |
NIGERIAN BOTTLING COMPANY |
EPC 2,5MVA Substation NBC Factory Owerri |
2007 |
NAOC |
Instrumentation Rehabilitation of vandalized Tebidaba Flow Station |
2007 |
NAOC |
Electrical Rehabilitation of vandalized Tebidaba Flow Station (Phase 2) |
2007 |
NAOC |
Electrical Rehabilitation of vandalized Tebidaba Flow Station (phase 1) |
2006 |
Federal Ministry of Power and Steel |
Supply and Installation of all material for the Electrification of Nnelu
Abia State |
2005
|
Gitto Costruzioni Nigeria Ltd |
Supply and Installation of all traffic lights and met bollardswith related power at Uyo metropolis and network roads |
2005 |
Gitto Costruzioni Nig. Ltd
|
Supply and Installation of all Street light and related power for Uyo Abak Road for Akwa Ibom Government |
2005 |
Philips Project
|
Supply and Installation of one substation to the new base in Port Harcourt 33KV 2,5MVA
|
2005 |
NEPA |
Supply and Installation of 33KV line Connecting National Grid to Yenagoa
|
2005 |
NIGERIAN AGIP OIL COMPANY |
Supply and Installation of 11 KV Cable for the Port Harcourt New Base main ring |
2004 |
ABIA STATE |
Engineering Procurement and Construction (EPC) of Rehabilitation Solar Traffic Light in ABA (Involving no. 6 junctions) |
2004 |
ABIA STATE |
Engineering Procurement and Construction (EPC) of Solar Traffic Light in UMUAHIA (no. 6 junctions) |
2004 |
BAYELSA STATE GOVERNMENT |
Supply, Installation and Training of Laboratory Equipment for Electrical, Mechanical and Civil Engineering Department, Niger Delta University, Amassoma, Bayelsa State. |
2004 |
NEPTUNE MARITIME TECNIP |
EPC of Power Panel for the new base at Rumuolumeni, Port Harcourt |
2004 |
SHELL PETROLEUM DEVELOPMENT COMPANY |
EPC Contract for Bille Community Electrification |
2004 |
NIGERIAN AGIP OIL COMPANY |
Supply and Installation of one Transformer 33/11KV 2,5MVA NAOC BASE Port Harcourt |
2004 |
NIGERIAN AGIP OIL COMPANY |
Supply and Installation of one Transformer 33/11KV 7,5 MVA Ebocha Flow Station |
2004 |
SAIPEM CONTRACTING LTD |
Supply and Installation of various LV cables at Samabri Biseni Flow Station |
2004 |
NIGERIAN AGIP OIL COMPANY |
Engineering, Procurament and Construction of ASB and Battery Charger panels for Samabri Biseni Flow Station 00 |
2004 |
NIGERIAN AGIP OIL COMPANY |
Refurbishment of the LV panels Control Room TEBIDABA FLOW STATION Including selectivity study and setting relays Protection |
2004 |
NIGERIAN AGIP OIL COMPANY |
Refurbishment of the LV Panel Control Room OBAMA Flow Station, Including selectivity study and Setting Relais Protection |
2003 |
NIGERIAN AGIP OIL COMPANY |
Laying and Installation of Cable joints for supply underground cable 33KV from Ninbe/Obama-Tebidaba Flow Stations |
2003 |
NIGERIAN AGIP OIL COMPANY |
EPC project for earthing resistor and prot of line 6,000V for Idu FS |
2003 |
NIGERIAN AGIP OIL COMPANY |
EPC PROJECT for SDV drivers 6,000V for Idu flow station |
|
2003 |
NIGERIAN AGIP OIL COMPANY |
Electrical rehabilitation OBAMA Flow station |
2003 |
FEDERAL MINISTRY OF DEFENCE |
Barracks rehabilitation at LAGOS |
2003 |
FEDERAL MINISTRY OF POWER AND STEEL |
Rural Electrification at Bolo (Rivers State) |
2003 |
FEDERAL MINISTRY OF POWER AND STEEL |
Rural Electrification at Ataba (Rivers State) |
2003 |
FEDERAL MINISTRY OF POWER AND STEEL |
Supply of no. 50 transformer 33,000/415 500KVA |
2003 |
NAOC |
Supply of 3,300m submarine cable with voltage rate of 33,000V |
2003 |
SPDC Port Harcourt |
EPC of 11kV substation at the SPDC Port Harcourt residential Area |
2003 |
NAOC |
Supply of spare parts ABB-SACE Substation at NAOC Base Port Harcourt |
2003 |
SPDC |
EPC Contract for One Substation 1000KW at R.A. Port Harcourt |
2003 |
NAOC |
Installation 33KV power station at Clough Creek |
2003 |
RIVERS STATE POWER MINISTRY |
Electrification phase 2 and 3 Borokiri (Port Harcourt) |
2003 |
NAOC |
Supply of 18,000m submarine cables with voltage rating of 33,000V |
2003 |
NAOC |
EPC NGV CAR FILLING STATION AT OB/OB BASE OBRIKOM (Second Gas Filling Station in Nigeria) |
2003 |
BONNY ALLIED INDUSTRIES LTD. |
EPC for a generator system Comprising of no. 2 Generators Perkins of 1250KVA each with a synchronizing panel and a change over system to be coupled with the existing power source. |
| |
|
|